Standing water in a recessed cover housing damages the mechanism and the fabric roll. Pool cover drainage requirements are the 3 inch outlet, the end-wall location, and the discharge path printed on the Cover-Pools and Coverstar sheets.

Pool cover drainage requirements are a recessed-housing outlet of 3 inches, set where the sheet prints it, with a discharge that can leave the site. Cover-Pools file 800024, printed page 3, places a 3 inch drain in the floor or the wall of a recessed housing. Printed pages 7, 8, 9, and 10 keep that drain on either end and hold the drain centerline to 4 inches maximum from the end wall. Coverstar file 1107 rates a 3 inch drain at 3,000 GPH and calls a 4 inch schedule 40 bottom exit to daylight, rated 6,000 GPH, the best drain. Coverstar CS 1800, printed page 3, requires a 3 inch drain to open air at the motor end. The T3 Evo owner's manual, printed page 9, requires adequate drainage on a below-deck or recessed housing and tells the owner to keep those drains clear.

Infographic titled Pool Cover Drainage Requirements, with the subtitle Outlet, daylight, and the low point, icons labeled Low point, 3-inch pipe, Daylight, and Dry well, and a housing with a drain leaving the box.
The banner names the four checks on this page: the low point, the 3 inch pipe, daylight, and a dry well. The housing on the right is an example. It carries no brand nameplate and no measured depth.
Input or item Typical value or source Why it matters
Recessed housing outlet, file 800024 printed page 3 3 inch drain in the floor or the wall This is the first drain line in that excavation list
Drain centerline, printed pages 7, 8, 9, and 10 4 inches maximum from the end wall. The 3 inch drain can sit on either end, in the floor or the wall The 4 inch limit is the centerline, and it is separate from the conduit notes on the same drawings
Autosave scope on printed pages 8 and 9 The drain note sits on sheets that limit Autosave to 13 ft or 200 square feet The centerline on those two pages stays with that mechanism
T4 Versa sheet, file 601985 Rel-0002 Underside track: 3 inch drain, floor or wall, either end, centerline 4 inches maximum. SnapTop: 3 inch floor drain, either end, center 4 inches maximum The sheet is marked provisional, and its dimension table is for pools up to 20 ft wide by 50 ft long
Coverstar file 1107 3 inch minimum, stated as 3,000 GPH. Best drain: 4 inch schedule 40 bottom exit to daylight, stated as 6,000 GPH Both ratings are printed on the same sheet
Site with no significant slope, file 1107 Finished pool height 24 inches above surrounding grade That rise is what gives the daylight pipe its fall
Housing depth, file 1107 Never under 14 inches. Floor pitch toward the drain, total fall 1-1/2 inches Depth and fall are two figures on this sheet
CS 1800 printed page 3 3 inch drain to open air at the motor-side end The distributor statement on that page leaves drainage type and adequacy with the job
CS 1800 printed page 11 3 inch drain at the motor end. A second drain at the non-motor end is highly advisable. Center drains are of little value. Floor flat and level for 3 feet at each end before any slope The level length is printed. A slope ratio is not
Checklist, file 800024 printed page 16 3 inch housing drain to air or to a pit. A separate line is 3 inch conduit for the hydraulic-unit housing The conduit is a hose sleeve, and the drain is the water line
Forgotten hose and the storm example, file 1107 Hose 600 to 1,500 GPH. A 20 by 40 pool at 2 inches of rain per hour is stated as 1,000 GPH Those loads are printed. A sump-pump model is not

Where the sheets place the 3 inch drain

File 800024, printed page 3, is the excavation list for a recessed mechanism with underside track or a track channel. Item 6 is a 3 inch drain in the floor or the wall of the recessed housing. The same file repeats the drain on the recessed-box drawings. Printed page 7 is the Save-T 3 underside box: the 3 inch drain can be in the floor or the wall, on either end, and the drain centerline is 4 inches maximum from the end wall. Printed page 8 is Autosave with conduit from the back of the box, and printed page 9 is Autosave with conduit from the side. Both keep the 3 inch drain and the 4 inch centerline. Printed page 10 puts the same drain note on the recessed box for Universal or SnapTop track. The deck-mounted bench drawings lower on that page do not repeat it.

The conduit notes beside those drains are a different measurement. Printed pages 7 and 10 say the conduit is on the motor end, protrudes no more than 4 inches into the box, and sits 6 inches maximum from the top of the box. That 4 inch conduit projection is the electrical sleeve. The 4 inch drain figure is the centerline distance to the end wall. The hydraulic design guide is the place for the hose route. Printed page 16 lists a 3 inch housing drain to air or to a pit, and, on its own line, 3 inch conduit for the hydraulic-unit housing.

Coverstar CS 1800, printed page 3, requires a 3 inch drain to open air at the end of the motor side. Printed page 7 asks for at least a 3 inch pipe at the motor end, so the owner can see and clear the drain cover. It accepts side drainage when that outlet is level with the floor. Printed page 11 requires a 3 inch drain at the motor end, calls a second drain at the non-motor end highly advisable, and says drains in the center of the housing are of little value because debris blocks them and they are harder to clean. The floor on that page is flat and level for 3 feet at each end before any sloping for drains.

The T4 Versa recessed-box sheet, file 601985 Rel-0002, is marked provisional. Its underside view uses a 3 inch drain in the floor or the wall, on either end, with the centerline 4 inches maximum from the end wall. Its SnapTop view uses a 3 inch floor drain on either end, with the center 4 inches maximum from the end wall. The dimension table on that sheet is for T4 Versa pools up to 20 ft wide by 50 ft long. Pit width and depth for the other mechanisms stay on the box and housing guide. The drain belongs in the installation sequence while the housing is still open, which is the point of the new construction guide.

Section of a cover housing with the end wall, a 4 inch maximum centerline, and a 3 inch drain in the floor.
Diagram of the end-wall centerline printed on the Cover-Pools recessed-box drawings. The 4 inch mark is the maximum from the end wall to the drain center. It is not a field measurement of a particular pool.

Daylight, a street line, or a dry well

File 1107 calls a 4 inch schedule 40 bottom exit to daylight, or open air, the best drain, and it rates that pipe at 6,000 GPH. The minimum on the same sheet is 3 inches, rated 3,000 GPH. When the site has no significant slope, the finished pool height is raised 24 inches above the surrounding grade so the daylight pipe can fall. The sheet says the size and the number of drains increase with pool size, and it does not print a table for that increase. Drains go at the ends, where they can be serviced, and they are stubbed before gunite. A form uses a closet flange for the stub. The floor pitches toward the drain for a total fall of 1-1/2 inches. Housing depth on this sheet is never under 14 inches. A side exit is allowed when the grade will not carry a bottom-exit daylight drain, and that side exit has to leave below the cover housing.

If daylight is impossible, file 1107 requires an adequately sized dry well or pump-out pit. The dry-well note uses 24 inch septic riser rings in 12 inch and 6 inch heights. A 6 foot dry well allows approximately 117 gallons below the cover box. Each additional 12 inch ring adds 23.4 gallons. The hole is 36 inches in diameter and 12 inches deeper than the planned well. The lid sits flush with finished grade, the bottom 12 inches are stone, and the drain is plumbed to the well. The sheet states that an open-bottom 24 inch dry well has 36 times the surface of a 4 inch pipe, and that the well can be cleaned out and can take a sump pump. It does not print a pump model or a pump flow rating.

CS 1800, printed page 7, lists three builder choices: drain to the street, drain to open air, and a French drain at an adequate distance after a percolation check. That page says the type of drainage is the pool builder's decision, the purchaser is responsible for housing drainage, and local building regulations still apply. Printed page 4 says French drains are not recommended unless the soil and the surrounding area can absorb full hose volume for an indefinite period. File 1107 is the later Latham sheet, copyright 2018, and it says not to use a French drain that ends buried in gravel. It says those drains typically fail within a year, because soil saturates in heavy rain and silt clogs the end. A 2019 reprint of file 1107 prints the same 3,000 GPH and 6,000 GPH ratings.

Three discharge ends: a pipe to open air, a dry well of rings, and a pipe buried in gravel.
Daylight and the dry well are the discharges file 1107 describes. The buried gravel end is the path that sheet tells the builder to leave out.

Rule of thumb. If the site has no significant slope, raise the finished pool 24 inches above surrounding grade before counting on a daylight drain. If the housing floor would finish under 14 inches deep, stop. Both thresholds are on file 1107. If a Cover-Pools recessed-box centerline would land more than 4 inches from the end wall, it misses the maximum on file 800024 printed pages 7 through 10.

The rainfall figure file 1107 prints

File 1107 says that if the housing is also the overfill drain, it has to handle a forgotten hose, stated as 600 to 1,500 GPH, or rainfall. It then states that a 20 by 40 pool left uncovered in a storm of 2 inches of rain per hour would have to handle 1,000 GPH.

Rain load (gal/h) = length (ft) × width (ft) × rainfall (in) / 12 × 7.5

20 × 40 × 2 / 12 × 7.5 = 1,000

The 7.5 is gallons in a cubic foot. The product is the 1,000 GPH the sheet prints for that storm. The sheet does not print 7.5, and it does not print a pump size that matches the 1,000 GPH.

The printed 3 inch rating is 3,000 GPH. That rating sits above the 1,000 GPH storm and above the 1,500 GPH top of the forgotten-hose range. The printed 4 inch rating is 6,000 GPH, which is twice the printed 3 inch rating. Use 6,000 / 3,000 = 2 only as that ratio of the two printed ratings.

Surface ratio = (24 / 4) squared = 36

File 1107 states that the 24 inch dry well has 36 times the surface of a 4 inch pipe. The squared diameter ratio is that printed 36.

117 / 23.4 = 5

Five of the printed 12 inch rings match the printed 117 gallons. The sheet still describes the well as 6 feet deep. The 5 is the quotient of those two gallon figures.

A buried gravel end that file 1107 says typically fails within a year is a second excavation after the housing is buried. The daylight pipe and the dry well with a flush lid are the paths that stay reachable. That rework sits in the installation sequence, and the pit it serves is the box and housing.

What fails, and what the sheet pairs with it

Drain choice on its own sheet Dominant failure mode and prevention
Center drain, CS 1800 printed page 11 and file 1107 Debris blocks a center outlet, and the outlet is hard to reach. Place the drain at an end. File 1107 says the ends are the service locations
Drain centerline past 4 inches, file 800024 printed pages 7 to 10 Water stands away from an outlet that is too far from the end wall. Hold the centerline to 4 inches maximum
Deck-drain tie-in, CS 1800 printed page 7 The housing fills during heavy rain when the deck line backs up. That page says to keep the cover drain off the deck drains, or to arrange the tie so the housing cannot fill
Buried gravel, file 1107 Silt closes the pipe end, and the sheet says this typically fails within a year. Use daylight or a dry well that can be opened
French drain on CS 1800 printed page 4 The soil cannot take full hose volume for an indefinite period. That page withholds a recommendation unless the soil can
Housing under 14 inches, or no fall, file 1107 The floor cannot pitch the printed 1-1/2 inches, or the box is shallower than the sheet allows. Keep the depth at 14 inches or more
Lid left off, T3 Evo printed page 12 Rain falls straight into the housing, and the opening is a step-in. Keep the lid in place
Hydraulic conduit used as the drain, file 800024 printed page 16 The hose sleeve is counted as the water outlet. The drain to air or to a pit is the other line on that checklist
Vanishing-edge drain on the motor end only, CS 1800 printed page 16 Pool water runs into the housing. That page puts the drain on the side wall at the negative-edge side, with the motor opposite the vanishing edge

Takeaway: copy the outlet, the end, and the discharge from the sheet that names the housing.

What to check once the lid is on

The T3 Evo owner's manual, printed page 9, says the motor can withstand short-term submersion and should not stay submerged for longer than a few hours. The same paragraph says a below-deck or recessed housing needs adequate drainage, and that the drains stay clear. When the mechanism is rinsed, all electricity to the cover is off first, and the housing still has to drain. The motor will take a direct spray at low force. The page prints no spray pressure. Standing water at the motor is an electrical stop, which is the subject of the electrical requirements.

Printed page 12, section 7.5.3, says any drain in the housing stays free of debris so water can leave, and the lid stays on so rain does not fall straight in and so nobody steps into the housing. Section 7.5.2 on the same page is a different pipe of water: as ice or snow melts, the cover pump removes it from the top of the cover. Water on the cover is the water-on-cover guide and the cover pump guide. Cold storage of that pump is the winter pump page. The lid joint that keeps rain out of the box continues on lid options.

The Coverstar underguide installation guide, printed page 6, has the installer wash the housing with a garden hose and watch the water leave. If there is no drain, or the drainage is inadequate, the page says to contact the Coverstar representative. Printed page 18 splits three checklist lines: adequate drainage from the housing, a cover pump tested in front of the owner, and a box clean enough that the drains are not easily clogged.

A finished housing with no outlet is recorded on the existing pool guide before anyone cuts the deck. This page does not add a drilled hole to a closed box.

Vanishing edges and the sheets that stop

CS 1800, printed page 16, is the vanishing-edge list. The motor is always opposite the vanishing edge. The housing drain goes on the side wall of the housing, on the negative-edge side. The lowered bond beam in front of the housing is 1 inch higher than the waterline, including where the track crosses from the negative edge, so pool water does not flow into the housing. That edge is the infinity pool guide.

File 800024 prints, on pages 7 and 10, that pools over 65 ft long or 25 ft wide, and vanishing-edge pools, go back to Cover-Pools rather than the standard box table. The footers on the drain drawings say the diagrams are general information and that the installation instructions govern the details. File 601985 is marked provisional. File 1107 does not print a sump-pump flow rating, and it does not print how many extra drains a larger pool takes. CS 1800 printed page 7 still lists a French drain as a builder option after a percolation check, while file 1107 rejects the buried-gravel end. A deck-mounted bench on file 800024 printed page 10 is outside the recessed drain callout.

Common questions

Can the housing drain tie into the deck drains?

CS 1800, printed page 7, says it is strongly recommended that the cover drain not be tied to the deck drains. If it is tied, the connection has to be arranged so the housing cannot fill during heavy rain. File 1107 does not list a deck-drain tie as a discharge.

Does a cover pump replace the housing drain?

The cover pump on T3 Evo printed page 12 removes melt water from the top of the cover. The housing drain is the pipe in the box, and printed page 9 still requires that pipe on a recessed housing. File 1107 allows a sump pump in the dry well and does not print the pump's flow rating. The Coverstar installation checklist, printed page 18, tests the cover pump and checks housing drainage as two lines.

Sources and method

Updated October 2026. This page explains pool cover drainage requirements from public manufacturer sheets. It is an independent account of those sheets. Field work still follows the sheet that matches the housing on a given pool.

  • Cover-Pools, General Information for Installing an Automatic Pool Cover, file 800024 Rel-0024, fetched 18 October 2026. Printed page 3: 3 inch drain in the floor or wall of a recessed housing. Printed pages 7, 8, 9, and 10: 3 inch drain on either end, drain centerline 4 inches maximum from the end wall. Printed pages 8 and 9 limit Autosave to 13 ft or 200 square feet. Printed page 10 also shows deck-mounted benches without repeating the recessed drain note. Printed page 16: 3 inch housing drain to air or to a pit, and a separate 3 inch conduit for the hydraulic-unit housing.
  • Cover-Pools, T4 Versa Recessed Box Details, file 601985 Rel-0002, copyright 2020, fetched 18 October 2026. One sheet, marked provisional. Underside: 3 inch drain, floor or wall, either end, centerline 4 inches maximum. SnapTop: 3 inch floor drain, either end, center 4 inches maximum. Dimension table: up to 20 ft wide by 50 ft long.
  • Cover-Pools, T3 Evo Owner's Manual, file 800249, fetched 18 October 2026. Printed page 9: adequate drainage for below-deck or recessed housings, drains kept clear, motor not submerged longer than a few hours, rinse only with electricity off. Printed page 12: housing drain kept free of debris, lid kept in place, cover pump for melt water on the cover.
  • Coverstar, Underguide Construction Specifications, CS 1800, fetched 18 October 2026. Footer page 3: 3 inch drain to open air at the motor-side end. Footer page 4: French drains not recommended unless the soil can absorb full hose volume indefinitely. Footer page 7: at least a 3 inch pipe at the motor end, deck-drain warning, side drainage if level with the floor, street, open air, or French drain after a percolation check. Footer page 11: motor-end drain, second drain advisable, center drains of little value, floor level for 3 feet at each end. Footer page 16: vanishing-edge drain on the negative-edge side wall, bond beam 1 inch above the waterline.
  • Coverstar, Underguide System Installation Guide, portal file 0405, fetched 18 October 2026. Printed page 6: hose wash, water must leave the housing, inadequate drainage goes to the Coverstar representative. Printed page 18: drainage, cover-pump test, and a clean box as separate checklist lines.
  • Latham Pool Products, Cover Housing Drainage, file 1107, copyright 2018, fetched 18 October 2026. One sheet. 3 inch at 3,000 GPH minimum, 4 inch schedule 40 at 6,000 GPH to daylight, 24 inch pool rise when the site has no slope, ends rather than the center, 1-1/2 inch total fall, housing never under 14 inches, dry well or pump-out pit, no buried-gravel French drain, 24 inch well with 36 times the surface of a 4 inch pipe, 117 gallons at 6 feet, 23.4 gallons per extra 12 inch ring, forgotten hose 600 to 1,500 GPH, 20 by 40 pool at 2 inches of rain per hour stated as 1,000 GPH. A 2019 reprint of the same file number prints the same two GPH ratings.

The local industry library had no pool-cover housing-drain manual for this topic. Cached search results had no stored SERP for this query. The sheets above are the primary text.